68th Street Bridge Reconstruction
A routine inspection of the 68th Street bridge over the Arizona Canal, just north of Indian School Road, discovered deterioration that will require substantial repair.
Aquatics Chemical System Replacement
Bring the city's aquatics operations into compliance with federal Homeland Security guidelines by replacing the existing chemical treatment systems in all city pools with an on-site chlorine generation system.
Civic Center Mall Master Plan
Work is underway to develop a plan for future uses of the space and identify opportunities for needed improvements and renovations to the Civic Center Mall.
Crosscut Canal Path & Bridge
The City of Scottsdale is getting ready to construct a series of improvements to provide connectivity from the Belleview bike route at 66th St. to the Crosscut Canal.
Downtown Splash Pad
The City of Scottsdale has begun design of a splash pad to be located on the south side of the Marshall Way Bridge.
Drinkwater Bridge and Underpass Repair Work
Due to concrete deterioration found during ongoing inspection work on the Drinkwater Bridge and Underpass, the underpass is now closed. Additionally, access over the top of the overpass, which is on Civic Center Mall, will be closed to all activity.
Fifth Ave Repaving Project
Construction work is set to begin on 5th Ave between Scottsdale Rd and Indian School Rd. The asphalt on 5th Ave has reached the end of it’s service life and must be replaced. Construction work will occur in several phases between Aug. 9 and Sept. 16.
Fire Station 603
Buy land, design and build a new site for Fire Station 603 in the McCormick Ranch area to improve response times to that portion of the city.
Fire Station 605
Fire Station 605 was built in 1983. This project would improve the bathrooms, locker rooms, bunk rooms, and kitchen. The renovated apparatus bay area also will include an OSHA compliant decontamination room and personal protective equipment storage.
Fire Station 613
Plans are underway to construct a new home for Scottsdale Fire Station 613 at the southwest corner of Jomax and Hayden roads.
Fire Station 616
In the 2015 Bond Election Scottsdale voters approved funds to replace a temporary fire station facility with a permanent fire station at 110th Street and Cave Creek Road.
Fraesfield and Granite Mountain Trailhead Improvements
The Fraesfield Trailhead and Granite Mountain Trailhead are two of the eleven trailheads that provide public access to Scottsdale’s McDowell Sonoran Preserve.
Granite Reef Watershed Drainage and Flood Control Improvement
The primary objective of the Granite Reef Watershed Improvement Project is to eliminate the risk of structural flooding, eliminate the Federal Emergency Management Agency (FEMA) floodplain along Granite Reef Wash, and reduce street and yard flooding.
Happy Valley Road: Pima Road to Alma School Road
This project will widen Happy Valley Road to two through lanes in each direction with a landscaped median, curb and gutter, bike lanes, sidewalk and drainage improvements from Pima Road through the intersection of Alma School Road.
Hayden and Thomas Intersection Improvements
The City of Scottsdale is currently designing a series of modifications to the intersection of Thomas and Hayden roads to improve the safety of the intersection.
Indian Bend Ranchos Waterline Replacement
The City of Scottsdale is currently designing a number of improvements to the water delivery system in the Indian Bend Ranchos neighborhood in order to provide residents with reliable water service.
Indian Bend Wash Master Plan: Thomas to McKellips
The City of Scottsdale is in the process of developing a master plan for Vista del Camino and Eldorado Parks to make sure they meet the needs of users and nearby residents today and for the future.
Main Street Streetscape
The City of Scottsdale is beginning design work on new streetscape guidelines for downtown Scottsdale, beginning with Main St. from Scottsdale Rd. to 69th St.
Mustang Transit Center
The city of Scottsdale is currently designing several transportation improvements along the 90th Street corridor between Shea Boulevard and Mountain View Road.
Osborn Road Improvements
The City of Scottsdale is in the early stages of planning a series of improvements along Osborn Rd. from Scottsdale Rd. to Hayden Rd., including a roundabout a Miller and Osborn roads.
Pima Road Improvements: Pinnacle Peak Road to Happy Valley Road
The project will widen Pima Road to three through lanes in each direction with a landscaped median, bike lanes, sidewalk and drainage improvements from 500-feet north of Pinnacle Peak Road to north of Happy Valley Road.
Pima-Dynamite Trailhead
This project is for the construction of amenities and other infrastructure improvements to serve passive recreational users at a major north community access area in the McDowell Sonoran Preserve.
Raintree Drive Extension
The Raintree Drive Extension will provide a direct connection between the SR 101L Freeway and Scottsdale Road. This extension will simplify the route from Hayden Road to Scottsdale Road and help to relieve some of the traffic congestion currently experienced on Frank Lloyd Wright Boulevard.
Reata Wash Flood Control Study
The city of Scottsdale is studying a FEMA-designated floodplain in the region known as Reata Pass Wash to determine the severity of the flood risk in the area and identify potential options for reducing the current FEMA floodplain.
Scottsdale Stadium Renovations
Creation of a master plan for the future upgrades, expansion and growth of the Scottsdale Stadium.
Thomas Groundwater Treatment Facility and Improvements to the Central Groundwater Treatment Facility
The city of Scottsdale is constructing a new Reverse Osmosis water treatment facility, the Thomas Groundwater Treatment Facility (TGTF), on Thomas Road adjacent to the existing Central Groundwater Treatment Facility (CGTF) at Pima Park.
Via Linda Roundabouts
The city will be replacing the traffic circles on Via Linda between Hayden and Pima roads with more modern roundabouts.
Water and Stormwater Infrastructure Upgrades at Pima Park
The city has obtained the large vacant parcel to the east of the park and plans to build a new water treatment facility and a storm water retention basin.

Contact Information

City of Scottsdale - Capital Project Management

7447 E. Indian School Road
Scottsdale, AZ 85251 

P: 480-312-7250 
F: 480-312-7971

Need Help?

480-312-3111

General City Information/Speak to a Citizen Service Specialist


Stay Up To Date

Manage Newsletter Subscriptions
(Subscribe / Unsubscribe)