| Location |
Resurfacing Material |
Planned |
100th Street (Paradise to Bell) |
Preservative Seal |
Completed |
104th Street (Cactus to Sweetwater) |
Preservative Seal |
Completed |
128th Street (Cactus to Larkspur) |
Slurry Seal |
Completed |
64th Street (Camelback to Hillcrest) |
Microseal |
Completed |
66th Street (Camelback to Chaparral) |
Microseal |
Completed |
68th Street (McDowell to Oak) |
Microseal |
Completed |
74th Street (Shea to Scottsdale) |
Microseal |
Completed |
90th Street (Raintree to Frank Lloyd Wright) |
Microseal |
Completed |
92nd Street (Raintree to Frank Lloyd Wright) |
Microseal |
Completed |
92nd Street (Thunderbird to Raintree) |
Rubberized Hot Mix Asphalt |
Completed |
Chaparral Road (Scottsdale to Miller) |
Rubberized Hot Mix Asphalt |
Nov 2008 |
Desert Camp Drive (south loop from Thompson Peak to Thompson Peak) |
Slurry Seal |
May 2009 |
Frank Lloyd Wright Boulevard (Scottsdale to Loop 101) |
Microseal |
May 2009 |
Happy Valley Road (Miller to Hayden) |
Slurry Seal |
Completed |
Hayden Road (Redfield to Frank Lloyd Wright) |
Microseal |
May 2009 |
Hayden Road (Oak to Thomas) |
Rubberized Hot Mix Asphalt |
Completed |
Hayden Road (Pinnacle Peak to Happy Valley) |
Microseal |
May 2009 |
Jomax Road (Scottsdale to Pima) |
Slurry Seal |
Completed |
McDowell Road (Hayden to Granite Reef) |
Rubberized Hot Mix Asphalt |
Completed |
McDowell Road (Granite Reef to Pima) |
Microseal |
Completed |
Miller Road (Williams to Pinnacle Peak) |
Slurry Seal |
Completed |
Mountain View Road / 70th Street (SW Shea Loop, from Scottsdale to Shea) |
Microseal |
May 2009 |
Redfield Road (92nd St to Raintree) |
Rubberized Hot Mix Asphalt |
Completed |
Scottsdale Road (Thunderbird to Greenway) |
Microseal |
May 2009 |
Scottsdale Road (Dixileta to Dove Valley) |
Rubberized Hot Mix Asphalt |
May 2009 |
Scottsdale Road (Jomax to Dixileta) |
Rubberized Hot Mix Asphalt |
Completed |
Thompson Peak Parkway (Union Hills to Desert Camp, southbound) |
Microseal |
Completed |
Thompson Peak Parkway (Scottsdale to Hayden) |
Microseal |
Completed |
Thunderbird Road (Hayden to 84th St) |
Rubberized Hot Mix Asphalt |
Completed |
Via Linda (136th St to 145th Wy) |
Slurry Seal |
May 2009 |