July 2011 thru June 2012
Planned Arterial Resurfacing

These dates and locations may change without notice - April 10, 2012

Location Resurfacing Material

Planned

2nd Street
(from Drinkwater Blvd to Scottsdale Rd)
 Rubberized
 Hot Mix Asphalt
 May 2012
Cactus Rd
(from 64 St to Scottsdale Rd)
 Microseal          COMPLETED
Hayden Rd
(from McCormick Pkwy to Via de Ventura)
 Microseal  COMPLETED
Miller Rd
(from Indian School Rd to Camelback Rd)
 Slurry Seal  Apr 2012
Pima Rd
(from Jomax Rd to Dynamite Blvd)
 Microseal   COMPLETED
Raintree Dr
(from Hayden Rd to Northsight Blvd)
 Rubberized
 Hot Mix Asphalt
COMPLETED
Scottsdale Rd
(from Indian School Rd to Camelback Rd)
 Rubberized
 Hot Mix Asphalt
 Apr 2012
Shea Blvd
(Loop 101 to 92nd St)
 Microseal    Apr 2012