Street Resurfacing Schedule
July 2011 thru June 2012
Planned Arterial Resurfacing
These dates and locations may change without notice - April 10, 2012
| Location | Resurfacing Material |
Planned |
| 2nd Street (from Drinkwater Blvd to Scottsdale Rd) |
Rubberized Hot Mix Asphalt |
May 2012 |
| Cactus Rd (from 64 St to Scottsdale Rd) |
Microseal | COMPLETED |
| Hayden Rd (from McCormick Pkwy to Via de Ventura) |
Microseal | COMPLETED |
| Miller Rd (from Indian School Rd to Camelback Rd) |
Slurry Seal | Apr 2012 |
| Pima Rd (from Jomax Rd to Dynamite Blvd) |
Microseal | COMPLETED |
| Raintree Dr (from Hayden Rd to Northsight Blvd) |
Rubberized Hot Mix Asphalt |
COMPLETED |
| Scottsdale Rd (from Indian School Rd to Camelback Rd) |
Rubberized Hot Mix Asphalt |
Apr 2012 |
| Shea Blvd (Loop 101 to 92nd St) |
Microseal | Apr 2012 |