Public Meeting Displays, February 2006

Displays shown at public meetings for the Streetscape project held on February 22 and February 23 are provided below. Displays have been divided into four categories:
The documents provided here are in PDF, and are best viewed using the Free Adobe Reader not a part of the city of Scottsdale website., version 6.0 or greater recommended; some features may not work with older versions.
  1. Overall Corridor; Master Plan and Design Guidelines

These boards show ideas and concepts about the entire corridor, and the Master Plan and Design Guidelines. Examples from other places are shown as well as applications specific to Scottsdale Road.

  1. Phase 1, McKellips Rd. to Osborn Rd.

These boards show design concepts for Phase 1 of the Streetscape from McKellips Road north to Osborn Road.

  1. Phase 1 Aerial Strip Maps

These maps for Phase 1 show how different features could fit into the existing roadway. The maps show existing right-of-way limits, proposed location of curb lines, location of travel lanes and proposed bicycle lanes, the right of way area proposed for additional landscaping, locations of possible median enhancements (pending additional coordination with adjacent property owners), and locations of primary and secondary oases. Each of the three main maps has been divided into three portions to allow for closer viewing of proposed improvements.

  1. Phase 2, Osborn Road to Chaparral Road

These boards show design ideas for Phase 2 of the Streetscape from Osborn Road to Chaparral Road. Displays show existing conditions, opportunities, landscaping and paving, site furnishings and lighting.

For additional information contact:
Madeline Clemann, Project Manager 
Phone: (480) 312-2732
Email: mclemann@scottsdaleaz.gov