2008 DS&PM |
1 Introduction (pdf/1.34kb/60pp/ 08-22-08) 1-1 Development Processes 1-2 Improvement Plan Requirements |
2 Site Planning (pdf/1.23MB/78pp/ 08-22-08) 2-1 General Considerations & Requirements 2-2 Environmentally Sensitive Lands (ESL) 2-3 Fire (now Chapter 11) 2-4 Disability Access |
| 3 Land Divisions & Dedications (pdf/257kb/46pp/ 08-22-08) |
| 4 Grading & Drainage (pdf/1.12MB/48pp/ 08-22-08) |
5 Transportation (pdf/3.03MB/190pp/ 08-22-08) 5-1 Transportation Impact Studies 5-2 ROW Management 5-3 Geometrics 5-4 Traffic Signal Design 5-5 Signs & Markings 5-6 Transit 5-7 Bikeways 5-8 Pedestrian Facilities 5-9 Neighborhood Traffic Management 5-10 Flexible Pavement |
| 6 Water (pdf/305kb/30pp/ 08-22-08) |
| 7 Wastewater (pdf/160kb/24pp/ 08-22-08) |
8 Streetscapes, Parks & Trails (pdf/1.6MB/86pp/ 08-22-08) 8-1 Landscaped Medians/ROWs 8-2 Parks 8-3 Non-Paved Trails |
9 Public Works & Facilities (pdf/1.27MB/62pp/ 08-22-08) 9-1 Infrastructure Plan Requirements 9-2 Facilities Plan Requirements 9-3 Building Standards 9-4 Construction Bid Documents |
| 10 Native Plants (pdf/79kb/10pp/ 08-22-08) |
| 11 Fire (pdf/104kb/8pgs/ 08-22-08) |