2006 DS&PM |
1 Introduction (pdf / 668 kb / 37 pgs) 1-1 The Scottsdale Development Process 1-2 Construction Plan Requirements |
2 Site Planning (pdf / 855 kb / 49 pgs) 2-1 General Considerations 2-2 Environmentally Sensitive Lands (ESL) |
3 Land Divisions & Dedications (pdf / 967 kb / 47 pgs) 3-1 Subdivisions 3-2 Land Divisions 3-3 Land Survey 3-4 Abandonments |
| 4 Grading & Drainage (pdf / 1.4 MB / 47 pgs) |
5 Transportation (pdf / 3.3 MB / 171 pgs) 5-1 TIMA 5-2 ROW Management 5-3 Geometrics 5-4 Traffic Signal Design 5-5 Signs & Markings 5-6 Transit 5-7 Bikeways 5-8 Pedestrian Facilities 5-9 Neighborhood Traffic Management 5-10 Flexible Pavement |
| 6 Water (pdf / 292 kb / 28 pgs) |
| 7 Wastewater (pdf / 149 kb / 24 pgs) |
8 Medians, Parks & Trails (pdf / 2.6 MB / 72 pgs) 8-1 Landscaped Medians 8-2 Parks 8-3 Non-Paved Trails |
9 Public Works & Facilities (pdf / 1.1 Mb / 60 pgs) 9-1 Infrastructure Plan Requirements 9-2 Facilities Plan Requirements 9-3 Building Standards 9-4 Bid Documents |
| 10 Native Plants (pdf / 79 kb / 11 pgs) |